Blufftowers

WINNER: STEFANUTTI STOCKS BUILDING KZN - BLUFF SHOPPING CENTRE PHASE 2         

The Bluff Towers project comprised of demolishing existing ground floor carpark area (originally at a gradient) and reinstating at level to allow for new shops. An additional level was introduced above this to tie into existing carpark area on roof level.

Vryheid Junction

HIGHLY COMMENDED : MAZCON CIVIL & BUILDING CONTRACTORS - VRYHEID JUNCTION FILLING STATION         

This project involved the bulk earthworks, creating platform and road formation. The main building consists of structural steel structure with brickwork infill, with a 1.2m high face brick dado on the perimeter walls. Mazcon Civil & Building Contractors used heavy equipment (plant) for earthworks and roads.